{"id":212,"date":"2016-09-02T14:21:56","date_gmt":"2016-09-02T14:21:56","guid":{"rendered":"http:\/\/libraryblogs.is.ed.ac.uk\/libraryredevelopment\/?p=212"},"modified":"2016-09-02T14:21:56","modified_gmt":"2016-09-02T14:21:56","slug":"evening-floor-closures","status":"publish","type":"post","link":"https:\/\/libraryblogs.is.ed.ac.uk\/libraryredevelopment\/2016\/09\/02\/evening-floor-closures\/","title":{"rendered":"Evening Floor Closures"},"content":{"rendered":"<p>As part of the ongoing electrical enabling works to accommodate the new study desks as part of the library refurbishment works, our contractors have scheduled a series of essential power shut downs from Monday 5<sup>th<\/sup> September 2016. The shut downs will be taking place from 21:00 to minimise disruption to library users. \u00a0On these dates, the following <strong>floors will be closed to both staff and library users whilst the works are being carried out:<\/strong><\/p>\n<p><strong>Mon 5th September<\/strong>: <strong>4<sup>th<\/sup> and 3<sup>rd<\/sup> floors closed from 21:00<\/strong> (to 06:00 Tues 6<sup>th<\/sup>)<\/p>\n<p><strong>Tues 6th September<\/strong>: <strong>2<sup>nd<\/sup> floor closed from 21:00<\/strong> (to 06:00 Weds 7<sup>th<\/sup>)<\/p>\n<p><strong>Weds 7th September<\/strong>: <strong>1<sup>st<\/sup> floor and Lower Ground Floor closed<\/strong> <strong>from 21:00<\/strong> (to 06:00 Thurs 8<sup>th<\/sup>)<\/p>\n<p>There will be no access to the closed floors from 21:00 until the library opens the following morning. Please be advised to collect items in advance of or after the dates and times above. Staff have been advised of any preparation required in advance of the power shut downs.<\/p>\n<p>Apologies for the disruption caused \u2013 thank you for your patience while work is underway.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of the ongoing electrical enabling works to accommodate the new study desks as part of the library refurbishment works, our contractors have scheduled a series of essential power shut downs from Monday 5th September 2016. The shut downs &hellip; <a href=\"https:\/\/libraryblogs.is.ed.ac.uk\/libraryredevelopment\/2016\/09\/02\/evening-floor-closures\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/libraryblogs.is.ed.ac.uk\/libraryredevelopment\/wp-json\/wp\/v2\/posts\/212"}],"collection":[{"href":"https:\/\/libraryblogs.is.ed.ac.uk\/libraryredevelopment\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/libraryblogs.is.ed.ac.uk\/libraryredevelopment\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/libraryblogs.is.ed.ac.uk\/libraryredevelopment\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/libraryblogs.is.ed.ac.uk\/libraryredevelopment\/wp-json\/wp\/v2\/comments?post=212"}],"version-history":[{"count":1,"href":"https:\/\/libraryblogs.is.ed.ac.uk\/libraryredevelopment\/wp-json\/wp\/v2\/posts\/212\/revisions"}],"predecessor-version":[{"id":213,"href":"https:\/\/libraryblogs.is.ed.ac.uk\/libraryredevelopment\/wp-json\/wp\/v2\/posts\/212\/revisions\/213"}],"wp:attachment":[{"href":"https:\/\/libraryblogs.is.ed.ac.uk\/libraryredevelopment\/wp-json\/wp\/v2\/media?parent=212"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/libraryblogs.is.ed.ac.uk\/libraryredevelopment\/wp-json\/wp\/v2\/categories?post=212"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/libraryblogs.is.ed.ac.uk\/libraryredevelopment\/wp-json\/wp\/v2\/tags?post=212"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}