Default utility Image

Main Library Summer Improvements 2016 – Update 18th August Work is continuing in the Main Library on a programme of works to bring significant improvements for library users through increasing the number of study spaces by 350 and providing …Continue reading →

Default utility Image

Main Library Summer Improvements 2016 – Update 3/8/2016   Work is continuing in the Main Library on a programme of works to bring significant improvements for library users through increasing the number of study spaces by 350 and …Continue reading →

Default utility Image

Main Library Summer Improvements 2016 – update 26/7/16 Work is continuing in the Main Library on a programme of works to bring significant improvements for library users through increasing the number of study spaces by 350 and providing …Continue reading →

Default utility Image

Main Library Summer Improvements –Temporary Disruptions to Users The Main Library is embarking on a programme of works to bring significant improvements for library users by increasing the number of study spaces by 350 and providing additional power …Continue reading →

Default utility Image

Changes to the existing new journals and new books display As part of the Main Library work over the summer to create additional study spaces for Library users, the existing New Journals and New Books displays on the first floor …Continue reading →

Default utility Image

Soft Furnishing Upholstery Works A number of soft seating areas within the library will undergo upholstery work during the summer – these include stools within the study pods on the ground floor, 1st floor …Continue reading →

Default utility Image

Study Pods – Audio Visual Upgrade Over the summer, we will also be upgrading the audio-visual kit in the Student Study Pods on the ground and first floor of the Main Library. The refresh will increase …Continue reading →

Default utility Image

PC Upgrades – Main Library We have started on a programme to upgrade all PCs on floors 3 & 4 to new HP EliteOne 800 G2 Models. This work will continue over the summer.  The …Continue reading →

Default utility Image

Main Library Study Spaces project blog goes live During summer 2016 358 additional study spaces will be created in the Main Library.  This blog will be updated weekly with information about what is happening in the building. We will let …Continue reading →

Follow @EdUniLibraries on Twitter

Collections

Default utility Image Archival Provenance Project: a glimpse into the university’s history through some of its oldest manuscripts               My name is Madeleine Reynolds, a fourth year PhD candidate in History of Art....
Rediscovering the Poetry of Louisa Agnes Czarnecki, a 19th-Century Edinburgh Writer and Musician Today we are publishing a blog by Ash Mowat, a volunteer in the Civic Engagement...

Projects

Default utility Image Giving Decorated Paper a Home … Rehousing Books and Paper Bindings In the first post of this two part series, our Collection Care Technician, Robyn Rogers,...
Default utility Image The Book Surgery Part 2: Bringing Everything Together In this blog, Project Conservator Mhairi Boyle her second day of in-situ book conservation training...

Archives

Subscribe to Blog via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.